پروژه بیمارستان 1000 تخت‌خوابی مشهد

The 1000-bed hospital project in Mashhad is one of the largest healthcare projects in Iran, designed to enhance patient services and improve the city’s healthcare infrastructure. In such massive projects, coordination between design, construction, and project management teams is crucial. Building Information Modeling (BIM) technology provides an integrated platform to optimize design, construction, and project management processes.

3D Modeling and Accurate Simulation

In the 1000-bed hospital project in Mashhad, 3D modeling through BIM was utilized to precisely simulate all building components, medical equipment, utility paths, and various sections. This 3D model allows the design team to identify and resolve potential issues before construction begins.

Time Management and Project Scheduling

One of the major challenges in hospital projects is the precise coordination between construction phases and the installation of medical equipment. BIM, with its 4D modeling, enables accurate time planning, minimizing temporal conflicts between different project sections. This results in reduced delays and increased efficiency in project execution.

Energy Optimization and Resource Management

Hospitals consume a significant amount of energy due to extensive use of medical equipment and HVAC systems. In the design and planning of the 1000-bed hospital in Mashhad, BIM helped engineers simulate energy consumption and implement optimal strategies to reduce energy usage and manage resources efficiently.

Facility Management and Maintenance Post-Construction

After the completion and operation of the hospital, the maintenance of medical equipment and building facilities is crucial. The BIM model serves as a digital reference, providing detailed information on equipment, electrical systems, mechanical systems, and plumbing. This enables maintenance teams to perform repairs and upkeep faster and with greater accuracy.

Conclusion

The application of BIM technology in the 1000-bed hospital project in Mashhad not only improved the design and construction process but also elevated resource management, scheduling, and equipment maintenance to a higher standard. This project stands as a successful example of BIM utilization in the healthcare sector and can serve as a model for similar projects in the country.